2019 | Acquistion of the oil mill in Mühlhausen |
2018 |
Acquisition of the 2. truck by Bayernhof Trans Beginning of alteration of MFS Mainfrankensilo Würzburg |
2017/2018 | stock at Straubing: installation of peeler for spelt wheat to the turn of the year |
2017 |
stock at Würzburg: stock at Regensburg: stock at Straubing: |
2016/2017 | stock at Hankofen: increase of the stock capacity of 1.600 to increase of the performance of the peeler for spelt wheat to about 15.000 to/year |
2016 |
stock at Hankofen: stock at Würzburg: |
2015 |
stock at Hankofen: Acquistion of the 1. truck by Bayernhof Trans |
2014 |
cooperation treaty for handling with the Raiffeisen Straubing demolition of the second press at the Regensburger Hafensilo |
2013 |
building of the conveying machinery to the port and of a 3.500 mt silo at Straubing-Sand buildung of the second dryer at the Regensburger Hafensilo |
2012 |
spring: building of the dryer at Mühlhausen |
2011 |
November: summer: expansion of the stock at the port of Mühlhausen by another 1.200 mt silo |
2008 | buy of Mainfrankensilo Würzburg incl. possibility of the loading of ships at the Main |
2007 | take-over of Regensburger Hafensilo at the Danube (Regensburg Westhafen) |
2006 |
building of stock at the port of Mühlhausen incl. the possibility of the loading of ships at the buy and holding of the stock at Feldkirchen (near Munich) incl. railway siding for the handling of trains |
2001 | building of the office at Hankofen |
1999 | take-over of the former stock of the Strohmeier family at Hankofen |
1992 | buy of the stock at Giebelstadt |
1989 | founding of Bayernhof GmbH |